Offshore
| No. | Projects/Title | Industry | Type |
| 1. | Engineering, Procurement, Fabrication and Commissioning of Fuel Gas Heat Exchanger for Helang Offshore Platform, E6080 | Oil & Gas | EPC |
| 2. | Engineering (Process/Mechanical), Procurement, Construction and Testing of Fuel Gas Skid for E11K-A | Oil & Gas | EPC |
| 3. | Project Management Consultant Services for Rezak Compressor Modules Project | Oil & Gas | PMC |
| 4. | Engineering Process and Mechanical, Procurement, Fabrication and Testing of Heat Exchanger for Larut Offshore Platforms | Oil & Gas | EPC |
| 5. | Engineering Process and Mechanical, Procurement, Fabrication and Testing of 11 units of Heat Exchangers for Angsi Development Project | Oil & Gas | EPC |
| 6. | Detailed engineering for multi-discipline and project management works for Lawit "A" Production Modules | Oil & Gas | PMC |
| 7. | EPC of Jacket and Topside for Chermingat 'A' for Newfield Peninsular Malaysia Inc. | Oil & Gas | EPC |
| 8. | Engineering, Procurement, Installation and Commissioning for NF-A (PS-4) Topsides Upgrade for Qatar Petroleum | Oil & Gas | EPIC |
| 9. | RBDP-B Topsides Ruby Full Field Development Project Stage 1 - Utility Gas Conditioning Skid, The Republic of Vietnam | Oil & Gas | EPC |
Onshore
| No. | Projects/Title | Industry | Type |
| 1. | Engineering, Procurement, Fabrication and Commissioning of LPG Bottling Plant for Bintulu, Sarawak including refurbishment of 4 units of bullet tanks | Oil & Gas | EPC |
| 2. | Engineering, Procurement, Construction and Commissioning for Silicon Wafer Fabrication Facility | Semi-conductor Wafer Fabrication Facilities | EPCC |
| 3. | Engineering, Procurement, Construction and Commissioning for Mechanical Piping and Heating Ventilation Air Conditioning System Phase 2 Package | Semi-conductor Wafer Fabrication Facilities | EPCC |
| 4. | Sultan Salahuddin Abdul Aziz Power Station, Kapar Oil Unloading Jetty for 35,000 Dead Weight Ton Vessel Hydrant Pipe Works | Power Generation | Constrn |
| 5. | Engineering, Procurement and Commissioning of 2 sets of deaerator to Putrajaya Precinct 2 | Power Generation | EPC |
| 6. | Engineering, Procurement and Commissioning of 2 sets of hot well tank to Putrajaya Precinct 2 | Power Generation | EPC |
| 7. | Engineering, Procurement, Fabrication and Testing of Jacketed, Fabricated Pipe for Flexsys Chemicals (M) CAP2 Project, Kuantan | Petrochemical | EPC |
| 8. | Engineering, Procurement, Fabrication, Erection and Testing of Field Erected Tank for Flexsys CAP2 Project, Kuantan | Petrochemical | EPC |
| 9. | Engineering, Procurement and construction of Bulk Terminal in Kuantan, Pahang (Mechanical, Civil and Structure only) | Petrochemical | Eng |
| 10. | Engineering design, Procurement and Construction of the complete facilities for the Cabot Booster Pump Relocation Project, including all process, mechanical, instrument, electrical and civil/structural works | Petrochemical | EPC |
| 11. | Cabot Malaysia Sdn Bhd's Booster Pump Relocation additional works | Petrochemical | EPC |
| 12. | Supply, install and commissioning a complete emergency standby system comprising a diesel genset to provide eletricity during a power outage and to run a number of critical process equipment | Petrochemical | EPC |
| 13. | Engineering, Procurement, Fabrication, Construction and Testing and Commissioning of mechanical services for make pack facilities and central plant addition for processing facilities expansion project | Petrochemical | EPCC |
| 14. | Procurement, Fabrication, Erection and Testing for Far East Phase 2 Project (The Mechanical, Civil and Structural Construction Package) | Petrochemical | EPC |
| 15. | Engineering, Procurement and Construction of Waste Water Treatment for processing factor expansion project | Petrochemical | EPC |
| 16. | Detailed engineering of finished product warehouse and interconnecting utilities pipelines for Malaysian Newsprint Industries Sdn Bhd | Petrochemical | Eng |
| 17. | Provision of engineering, procurement, construction, commissioning for rectification and modification works of GPP-5 Acid Gas Incinerator unit, GPP Complex-B, Terengganu | Petrochemical | EPCC |
| 18. | Supply of specialists/engineers for project works | Petrochemical | PCM |
| 19. | Procurement, Construction and Commissioning service for Petronas Gas Processing Plant Nos. 2, 3 and 4, Ethane Extraction Improvement Project, Kerteh, Terengganu | Petrochemical | Constrn |
| 20. | Provision of engineering and installation service for the mechanical erection works at Pump Station 2 (PS2) for the Tchad-Cameroon Pipeline Project, Republic of Cameroon | Oil & Gas | Constrn |
| 21. | Piping and equipment insulation works for District Cooling Plant Project, Putrajaya Precinct 2 | Co-Gen | Constrn |